Print
Category: FAQ's
Hits: 4085

Again it depends on the size and purpose of the desired reef project. However, we are able to deliver and install a CRC Coral Reef within
2 - 3 months (depending on the location). Then we will continuously follow up and monitor the evolution of the reef. This monitoring is performed
over 2 years or conducted additionally as stated contractually.